Total time: 448 hours
Total landings: 98 landings
Certificate of airworthiness: February 26, 2021
Entry into service: August 5, 2021
Rolls-Royce BR725-A1-12
Left Engine
Serial Number: 26023
Total Time Since New: 448 hours
Total Cycles Since New: 98 cycles
Right Engine
Serial Number: 26022
Total Time Since New: 448 hours
Total Cycles Since New: 98 cycles
Honeywell RE-220,
Serial Numbers: P-582
Time Since New: 222 hours
1 Gulfstream PlaneViewTM II / Honeywell Primus Epic Avionics Suite / FANS 1A+ / ADS-B Out V2
4 Flat-panel LCD Electronic Display Units
3 Multi-Function Control Display Units (MCDUs)
2 Standby Multifunction Controllers (SMC)
2 Cursor Control Devices (CCDs)
4 Multifunction Air Data Probes (MFPs)
3 Flight Management Systems (FMS)
2 Automatic Flight Guidance Systems (AFGS)
2 Autothrottles (AT)
1 Head Up Display (HUD) / Enhanced Vision System (EVS)
1 Multi-channel Satellite Communications System (SATCOM)
2 High Frequency (HF) Communications Transceivers
2 Very High Frequency (VHF) Communication Transceivers
1 Very High Frequency (VHF) Communication/Navigation (NAVCOM) Unit
2 Very High Frequency (VHF) Navigation Receivers
1 Automated Direction Finder (ADF) Receiver
2 Air Traffic Control (ATC) Mode S Transponders
1 Traffic Collision Avoidance System (TCAS)
2 Distance Measuring Equipment (DME) Transceivers
1 3-D Color Weather Radar System
3 Inertial Reference Systems (IRS)
2 Global Positioning Systems (GPS)
2 Radio Altimeters (RA)
2 Enhanced Ground Proximity Warning Systems (EGPWS)
1 Emergency Locator Transmitter (ELT)
1 Flight Data Recorder System (FDR)
1 Cockpit Voice Recorder (CVR)
Engines enrolled on Rolls-Royce Corporate Care
24 Month Inspection due August 2023
Ka Band High Speed Data System
Honeywell LSZ-860 Lightning Sensor System (ASC-006B)
Securaplane 500 Aircraft Security System
Runway Awareness Advisory System (ASC-005A)
Predictive Windshear (ASC-007A)
Cockpit Voice Recorder 25 hour upgrade EASA (ASC-141)
Satcom Direct Router Installation
Emergency Vision Assurance System (EVAS)
26-inch HD LCD monitor forward side of the aft left-hand bulkhead
Refrigerator / Freezer Unit in galley
26-inch HD LCD monitor in right-hand forward cabin bulkhead
12-inch leaf extension for conference dining table
Hinged Baggage Shelf
Universal 60hz outlets
Enhanced Soundproofing
Ionizer Air Purification System
Cabin layout: Seventeen-passenger configuration with forward crew rest
Forward cabin: Four single club seats
Mid cabin: Four-place conference group opposite a three-place divan
Aft cabin: Two three-place divans
Galley: Forward galley, convection oven, microwave oven and two coffee makers
Lavatory: Forward crew and aft passenger lavatories
Seats: Volaero, Bilbao
Divan: Volaero, Bilbao
Headliner/PSU: Ultraleather China White
Sidewall: Ultraleather Linen China White
Countertops: Quartz-polymer
Wood: Comp European Walmart
Metal finish: Satin Almond Gold
Carpet: Bellevue
Exterior: Matterhorn White fuselage with Bright Blue and Dark Blue stripes
Completion Labor & Material: Until August 4, 2023
Production Component Labor & Material: Until August 4, 2026
Production Structural Labor and Material: Until August 4, 2041 or 20,000 hours
Rolls-Royce Engine/TR Labor and Material: Until August 4, 2027 or 3,500 hours
Rolls-Royce Nacelle: Until August 4, 2041