One US Owner Since New
Impeccable Inside & Out
Extremely Well Equipped
Less Than 1000 Hours Total Time
Recent 60 Month Inspection
Domestic & International WiFi
Total Time Since New: 967 Hours
Total Landings Since New: 561
Maintenance Tracking: FlightDocs
Certification: PART 91
Airworthiness Date: 21 Sept 2016
Honeywell AS907-3-1E-A2
Honeywell MSP
Left Engine
Serial Number: P131219
Time Since New: 967 Hours
Cycles Since New: 561
Right Engine
Serial Number: P131220
Time Since New: 967 Hours
Cycles Since New: 561
Make/Model: GTCP36-150(EMB)
APU Program: Honeywell MSP
Serial Number: P-166
Total Time Since New: 573
Collins Proline Fusion Avionics Suite
Four 15.1″ Active Matrix Liquid Crystal Smart Displays
Dual Enhanced AHRS
Dual FMS w/ Take-off & Landing Performance Calculation (TOLD)
Dual VHF Communication Transceivers
Dual GPS w/ SBAS/WAAS
Dual NAV Receivers (VOR/ILS/MB)
Synthetic Vision (SVS) w/ Full Screen Presentation
Autothrottle System
Navigation Charts Capability – IFIS
Multi-scan Weather Radar w/ Turbulence Detection
TCAS II w/ Dual Enhanced Mode S Transponders
CVR & FDR
HUD | EVS | FANS 1/A+
CAT II & Steep Approach Capable
ATG-5000 WiFi (Domestic)
Aviator 350 WiFi (International)
CPDLC over ATN (EASA Link 2000+)
ACARS Datalink
Paperless Operation Capability
Third VHF
RNP AR 0.3
Dual HF Plus SELCAL
FMS 4D Trajectory
Satellite Data Weather (XM)
115 cu ft. Capacity Oxygen Cylinder
12/60 Month Inspection c/w Nov 2021
750 Hour Inspection c/w Nov 2020
36 Month Inspection c/w Oct 2019
Additional Maintenance Information Available Upon Request
Completition Details
Interior New: 2016
Seating Details
2 Crew + 9 Passengers
Fwd 4-Place Club, Mid , Aft 2-Place Club opp. 3-Place Divan
Cabin Amenities
ATG-5000 WiFi (Domestic)
Aviator 350 WiFi (International)
Enhanced Seat Upgrades & CMS
19″ HD Monitors in Bulkheads
Two Personal Monitors
XM Satellite Radio
Stone Floor Upgrades in Galley & Lavatory
Galley
Microwave, Convection Oven, Refrigerator & Nespresso Machine
Lavatory
Spacious aft lav w/ Sink & Vanity, Belted
Completition Date: 2016
Finishing: Factory Demonstrator Scheme