12, 24, 48 Month Completed January 2024
Bombardier Level 3 PPI Underway
Ka-Band Internet
HUD and EVS Equipped
10 Passenger Configuration
Total Time Since New | 628.5 Hours (as of February 15, 2024) |
Total Landings Since New | 255 Landings |
Certification Date | February 2019 |
Entry into Service Date | March 2019 |
Maintenance Tracking | CAMP |
Left Engine | Right Engine | |
Description | General Electric CF34-3B | |
Engine Serial Numbers | 801539 | 801538 |
Total Hours Since New | 625 Hours | 625 Hours |
Total Cycles Since New | 267 Cycles | 267 Cycles |
Program Coverage | To Be Enrolled on GE OnPoint |
Description | Honeywell GTCP36-150 |
APU Serial Number | P-535 |
APU Total Time Since New | 717 Hours |
Program Coverage | Honeywell MSP |
SB650-23-008 – Future Air Navigation System (FANS) Upload of Encryption Key |
SB650-23-007 – Upgrade the Datalink System to Meet Link 2000+ |
SB650-23-002 – Installation of the Datalink System |
SB650-23-001 – Installation of the 3rd VHF |
Inspection | Last Performed | Next Due |
12 Month | January 2024 | February 2025 |
24 Month | January 2024 | March 2025 |
36 Month | February 2022 | February 2025 |
48 Month | January 2024 | March 2027 |
96 Month | – | March 2027 |
Internet | Ka-Band |
Display Monitors | Forward and Aft Bulkhead |
Number of Passengers | Ten (10) |
Galley Location | Forward |
Forward Cabin Configuration | Four (4) Place Club |
Aft Cabin Configuration | Two (2) Place Club Opposite a Four (4) Place Divan |
Lavatory Locations | Aft Executive |
Last Refurbished Date | Original Completion |
Base Paint Color(s) | White |
Stripes | Blue and Gray |